Roof replacement
Full tear-off with a written scope — ventilation, underlayment, and all.

What the work covers
When a roof is done, we lay out materials, price, and timeline in writing before you commit. Clean tear-off to the deck, ice-and-water at the eaves and valleys, proper intake and exhaust ventilation, and a crew that tarps your landscaping and runs a magnet over the yard at the end.
- Tear-off to the deck — no layovers
- Ice-and-water shield at eaves and valleys
- Ventilation calculated, not guessed
- Written scope, no mystery change orders
Questions people ask about this
Tear-off, or a layer over the top?
Tear-off to the deck. A second layer hides whatever the first one was doing and makes the next roof harder, and nobody can inspect a deck they cannot see.
What decides the price?
Size, pitch, how many layers come off, the material, and what the deck looks like once it is open. The figures on this site are sample ranges on a concept site, not a quote.
What about ventilation?
It gets calculated from the attic space rather than copied from whatever was there before. Intake and exhaust have to match, and an unbalanced roof cooks shingles from underneath.
Other things we do
The project image on this page is a generated concept, not a Ridgeline Roofing project.